
Water source Girls House
After the full renovation of the girls house in 2020, a new water source (drilling hole) and water supply need to be installed. During summer the government source can’t provide enough water.
300.000 THB donated
After the full renovation of the girls house in 2020, a new water source (drilling hole) and water supply need to be installed. During summer the government source can’t provide enough water.
300.000 THB donated