All new Boys House 2
The health authorities will close the oldest Boys House 2 for 80 children most probably by the end of 2021. Due to COVID and less donation postponed to 2023.
0 of 6.000.000 THB donated
About The Project
There is currently no budget for complete building restoration. The restoration is urgent but is probably not possible before 2021.
- The ground floor must be lowered in order to increase the ceiling height.
- The roof must be raised by 1.5 m in order to achieve the required ceiling height on the 1st floor.
- Installing a new false ceiling
- Complete renovation of the living room
- New power supply and conversion to LED lighting
- New windows and mosquito protection
- Completely new facility with beds and cupboards